The subfloor is cleaned, lightly sanded and prepared ready for the ply wood overlay.
The subfloor is then covered with a ply wood overlay. The joints and screw holes are then filled to create a perfectly flat surface for the vinyl flooring.
We then start laying the vinyl flooring with the pressure sensitve adhesive.
The completed flooring, ready for the kick boards to be installed.